Full scale demonstration of seriel digestion

In connection with an 2008 expansion and renovation of Lemvig Biogas Plant, various serial operation configurations were tested/demonstrated in full scale. The plant was expanded from having a digester capacity of 3 pcs. 2000 m3 digesters (total 6000 m3) with an additional 7000 m3 digester and total digester capacity 13000 m3. At the same time dige
Project description
In connection with an 2008 expansion and renovation of Lemvig Biogas Plant, various serial operation configurations were tested/demonstrated in full scale. The plant was expanded from having a digester capacity of 3 pcs. 2000 m3 digesters (total 6000 m3) with an additional 7000 m3 digester and total digester capacity 13000 m3. At the same time dige
Results
A significant improvement of digestion efficiency was noted when digestion was changed to serial mode and average total retention time increased. Actual plant biogas yield, compared to the biogas potential, increased from apprx. 86.5% to 90.5-94.9%, corresponding to an increase of 5-10% of specific methane yield. Furthermore, improved process stability and ammonia tolerance was noted. (Energy 11)

Key figures

Period:
2008 - 2010
Funding year:
2008
Own financial contribution:
0.23 mio. DKK
Grant:
0.66 mio. DKK
Funding rate:
74 %
Project budget:
0.89 mio. DKK

Category

Programme
ForskEL
Technology
Bio and waste
Case no.
10115

Participants

Lemvig Biogasanlæg Amba (Main Responsible)
Partners and economy
Partner Subsidy Auto financing
Burmeister & Wain Scandinavian Contractor A/S
Danmarks Tekniske Universitet (DTU)

Contact

Kontakperson
Kristensen, Lars
Comtact information
Lemvig Biogasanlæg Amba
Pillevej 12
DK-7620 Lemvig
www.lemvigbiogas.dk
Tlf.: 98811400
 