Optimisation of kWh production and reliability of WSE unit
The project aims at optimising Wave Star wave machine production from irregular waves through sophisticated control of the back pressure in the hydraulic system in each floater. The system is being developed at the two test floaters at Roshage Mole for subsequent implementation at the 500 kW unit with 40 floaters
Project description
0
Key figures
Period:
2009 - 2011
Funding year:
2009
Own financial contribution:
5.00 mio. DKK
Grant:
5.00 mio. DKK
Funding rate:
50 %
Project budget:
10.00 mio. DKK
Participants
WAVE STAR A/S (Main Responsible)
Partners and economy
Partner | Subsidy | Auto financing |
---|---|---|
WAVE STAR A/S | 2,37 mio. DKK | 3,36 mio. DKK |
Benny Petersen Industriservice ApS | 0,25 mio. DKK | 0,27 mio. DKK |
Jens Vulff ApS | 0,75 mio. DKK | 0,75 mio. DKK |
JURAG SEPARATION A/S | 0,10 mio. DKK | 0,10 mio. DKK |
SVEND OLE HANSEN ApS | 0,76 mio. DKK | 0,76 mio. DKK |
Yacht Design | 0,25 mio. DKK | 0,25 mio. DKK |
Aalborg Universitet (Fredrik Bajers Vej) | 0,52 mio. DKK | 0,00 mio. DKK |
Contact
Kontakperson
Hylleborg, Jeanette
Comtact information
Wave Star Energy A/S
Maglemosevej 61
DK-2920 Charlottenlund
www.wavestarenergy.com
Tlf. 31724696
Contact email
jhy@wavestarenergy.com