The main purpose of the IEA SHC Task is to demonstrate the possibilities regarding deep energy renovation of historic buildings in achieving the lowest possible enerdy demand and thereby CO2 emissions
This main objective of this project is to demonstrate procedures that can quantify the risk of failure, the remaining structural reliability and the maintenance costs upon extending the life of
The overall aim of the project is to develop and test the next generation of direct solar-powered coolers for storing vaccine and other temperature sensitive products such as fish and meat in areas
The purpose of this project is to develop better recommendations for understanding the solar energy resource in energy systems with high degree of renewable energy penetration. This is done as an
IEA Wind Task 28” on Social Acceptance of Wind Energy Projects is a working group involving several countries, including the USA, Germany, Denmark, Switzerland, Japan, Ireland, Italy and the
Because these hours are incoherent and unpredictable, a constant availability of power is imperative and as a result the generator has to be operating around the clock. Thus Power Pack will contribute
A wind turbine power converter includes power modules mounted on cooling plates, which cool the component. The heat is transferred to the ambient by use of a water circuit and an air cooler. The
The objective is to continue Danish management of IEA SHC Task 57 ”Solar Standards and Certification” until the end of the task period. This task supports international co-operation on improvement and
The aim of the project is - through exchange of international knowledge - to develop and promote solar district heating plants. Denmark is in front in this field and the project gives good
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2018 through participation as Alternate member in the Agreement Steering
The project will design and test innovative blade tips for wind turbines which can increase the existing rotor size, producing up to 8% more energy per year, while regulating loads in a smart way.
Every wind farm project requires accurate resource assessments to evaluate the energy yield and profitability, but for projects in hilly, mountainous or forested areas the measurement campaigns can be
Small cracks in wind turbine bearings are responsible for some of the most expensive wind turbine failures. Today, there are no certain methods of preventing the cracks, but a new project led by DTU
RUNE is short for - Reducing Uncertainty of Near-shore wind resource Estimates using onshore lidars. The key project aim is to reduce the uncertainty of offshore wind resources in Danish near-shore
A main result of the Low Cost Active House BIPV project is to realise a demonstration campaign with 3 MWp, low cost BIPV solutions in connection to low energy class 2020, energy neutral and plus
Combining silicon solar cells and high efficiency solar cells into one cost-efficient, high-efficiency solar cell has been a dream of the solar industry for decades. However, differences in the
RePlan project is a frontrunner for the integration of large share of renewable energy in the Danish power system. The novelty of RePlan consists in the investigation and verification of the ancillary
Grid side converter (GSC) is the key for PV integration. GSCs are still not capable of advanced control features that enable the full control of PV systems with fault ride through, reactive power