The purpose of this project has been to extend the foundation module in HAWC and FLEX to be able to simulate the frequency dependent stiffness and damping of the foundations.
The Project is a preliminary study of the possibilities for realization of 'Wind Power Academy' on Lolland. The vision of a Wind Power Academy was made as Energi E2 decided to establish a new park of
The operating responsible for the Danish electricity grid (Energinet.dk) asks for more competitors in the liberalised market for fulfilling national obligations for contracts of standby regulating
The project developed technology for demand frequency controlled reserve (DFR) implementation, a system that automatically stops or starts electricity consumption in response to system frequency
The project suggest a multiagent based flexible control architecture (subgrid control) suitable for the implementation of innovative control consepts. The subgrid architechture is tested on a novel
Design and planning of wind turbines involves considerable uncertainties related to estimating the energy production and to assessment of loads and load carrying capacities.
The project aimed at studying the effect of inflow turbulence in blade calculations by using CFD and with several Delayed Detached-Eddy simulations (DDES) for blade profiles, both profiles in free
The project developed probabilistic methods for optimum operation and planning of contemporary distribution systems, including probabilistic models for wind power, small-scale CHP plants and load. It
During the project, we developed oxygen membranes based on ion-conducting ceramics. They allow pure oxygen to be extracted from air and be used in ceramic processes.
The project focused on 12 MW wind turbines, i.e. the next generation of multi MW wind turbines being developed for offshore wind farms. These gigantic wind turbines with hub heights of 170 m and rotor
The project measured switch transients and voltage quality for three different turbine types in three offshore wind farms: Nysted, Horns Rev and Burbo Banks. The project documented voltage conditions
The object of the project was to furnish a dimensioning basis for future offshore wind turbine foundations. This work contributed to greater understanding of erosion conditions around monopole
It is technically possible to manage and activate the potential for flexible electricity consumption in the segment of large office blocks and public buildings. Practical experiments have shown that
The object of the project was to develop an experimental method for estimating the modal properties of wind turbines during operation. OMA (Operational Modal Analysis) proved suitable for
This project is one of several projects with the common purpose of predicting electricity generation from a wind farm for up to 48-60 hours based on meteorological forecasts.
The main goals of the simulation platform can be summarized as follows: 1) To extend the ability of the existing wind turbine design tools to simulate the dynamic behavior of the wind turbines and the