This main objective of this project is to demonstrate procedures that can quantify the risk of failure, the remaining structural reliability and the maintenance costs upon extending the life of
IEA Wind Task 28” on Social Acceptance of Wind Energy Projects is a working group involving several countries, including the USA, Germany, Denmark, Switzerland, Japan, Ireland, Italy and the
Because these hours are incoherent and unpredictable, a constant availability of power is imperative and as a result the generator has to be operating around the clock. Thus Power Pack will contribute
A wind turbine power converter includes power modules mounted on cooling plates, which cool the component. The heat is transferred to the ambient by use of a water circuit and an air cooler. The
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2018 through participation as Alternate member in the Agreement Steering
The project will design and test innovative blade tips for wind turbines which can increase the existing rotor size, producing up to 8% more energy per year, while regulating loads in a smart way.
Every wind farm project requires accurate resource assessments to evaluate the energy yield and profitability, but for projects in hilly, mountainous or forested areas the measurement campaigns can be
Small cracks in wind turbine bearings are responsible for some of the most expensive wind turbine failures. Today, there are no certain methods of preventing the cracks, but a new project led by DTU
The project included the following milestones: 1) Wind tunnel measurements on a NACA 63-415 airfoil with a modified leading edge. 2) Detailed verification of 3D Computational Fluids Dynamics (CFD)
The project will contribute to the basis for connecting large wind farms to power transmission grids regarding voltage quality and power system stability.
On short term the aim with this project is to collect and analyse knowledge about wind and sea, to make it possible to make the tenders for the first offshore wind farms ultimo 1999. In finalised form
The goal was to get optimum benefits of the wind farm technically and financial. The better information about the wind farm status and the better forecast of the production the better prize you get
Tech-wise A/S has conducted a life cycle assessment of a 2 MW offshore wind turbine. A life cycle assessment (LCA), also known as a cradle to grave analysis, is an inventory of all environmental