The objective of BLATIGUE-2 is to develop fast and efficient fatigue testing methods for large wind turbine blades, to develop smart equipment to excite the blades under such tests and to increase
The purpose of the project is to increase the liability of blades in operation by installing RTZ Solution. Further, the purpose is to reach higher cost efficiency and higher AEP for the wind turbine
Fatigue of fiber rope is crane applications is not well established, why extensive full-scale testing is currently required for using fiber ropes in crane applications. The main objective of this
LERCat enables leading edge roughness (LER) repairs of wind turbine blades at the right time, yielding a 1 bn DKK/year gain across the partners’ turbine fleets. This is achieved by establishing an
The project involves the development and maturement of a drone charging station and a drone system. The combined system should then be capable of conducting autonomous wind turbine inspections and
Managing offshore corrosion is a subject that is heavily regulated and combined with several industry standards that must be followed to ensure the structure integrity of the assets. Yet, whilst, and
The purpose of IDEA is to establish reference site conditions and wind reference wind farm designs for floating wind turbines. The project follows the international IEA project on wind farm design and
The overall objective of this project is to further adapt, improve and expand the existing operational tracking technology that Claviate has developed to cover the entire onshore wind turbine
We aim to demonstrate that a radically new blade technology combining jointed modular blades with advanced tips made with additive manufacturing can enable increased rotor sizes by up to 20% and lead
This project aims at improving the forecast of wind and waves for storm conditions offshore. We explore coupling strategies for the atmospheric, wave and ocean modeling using WRF (WRF-LES), MIKE 21 SW
The costs of the management of seabed wind farm interaction is high, around one third of the total costs of the foundation of offshore wind farms. The aim of the project is to reduce these costs by
The Megavind Partnership´s vision is to maintain and develop Danish position as wind energy hub and home to the world´s leading companies and research institutes. Megavind´s objective is to identify
Interruptions of installation/uninstallation of wind turbine blades due to high wind speed are a huge cost for the wind industry, especially offshore. The objective of this project is to be able to do
A unique and dedicated software tool for small and medium size wind turbines - Online WAsP - is proposed to ensure inexpensive but accurate calculations of energy yields, noise impacts and financial
The objective of this project is to establish a novel type of wind load simulator where the true nature of wind can be simulated. The wind load simulator is central part of a new generation of test
The purpose is to develop and demonstrate a solution, an integrated Crane Basket, solving the challenge to get technicians access to blades on installed turbines – on- as offshore, for safe and
Task27 will focus on the research needs for understanding small wind turbines and their performance in environments of high turbulence including the built-environment. The subtasks are: Continue the
The purpose of ODIN-WIND is to develop and demonstrate a management tool for the decommissioning of offshore wind turbines. The tool will enable stakeholders to reduce the risk, cost and time spent on
To develop and demonstrate cost effective solutions for mitigating leading edge damages on blades on both existing and future wind turbines, based on Bladena’s patented technologies for mitigating