The project focused on 12 MW wind turbines, i.e. the next generation of multi MW wind turbines being developed for offshore wind farms. These gigantic wind turbines with hub heights of 170 m and rotor
The project measured switch transients and voltage quality for three different turbine types in three offshore wind farms: Nysted, Horns Rev and Burbo Banks. The project documented voltage conditions
The object of the project was to furnish a dimensioning basis for future offshore wind turbine foundations. This work contributed to greater understanding of erosion conditions around monopole
The object of the project was to develop an experimental method for estimating the modal properties of wind turbines during operation. OMA (Operational Modal Analysis) proved suitable for
This project is one of several projects with the common purpose of predicting electricity generation from a wind farm for up to 48-60 hours based on meteorological forecasts.