The purpose of the project is to analyse and develop advanced filter solutions based on combinations of passive filters and active filters in wind power plants. The use of passive filters is almost
The project ” Multi-level medium voltage” converter is a development and demonstration project, which by proposing at new design aims at optimizing one of the most important subsystems in a wind
To learn how to build the hybrid UHPC tower in praxis and prepare the technology for commercialization. Further development to up-scale the towers to larger heights, to make the towers entirely from
Task 35 will focus on wind turbine blade and drive train testing and assess their performance and failure criteria in different operating scenarios. The subtasks are: l) Relevant wind turbine
Our objective is to demonstrate an efficient, rugged, low-cost lidar for wind turbine blade pitch control. The new sensor will monitor the wind in front of the turbine using 4 lines-of-sight. This
The purpose of the project is to investigate the future testing strategies for the leading wind turbine manufacturer, to design, develop, assemble and demonstrate the future testing facility to
The New European Wind Atlas wiII as a minimum include: wind resources and their associated uncertainty; extreme wind and uncertainty; turbulence characteristics; adverse weather conditions together
The project aims to develop a new node for offshore wind foundations. Objectives are: 1) New design for process and assembly of jacket foundations; 2) Cost-efficient welding of nodes; 3) Mass
The foundation for wind turbines at sea needs to withstand occational extreme waves. Extreme waves are a well known phenomenon, however the exact stress they put on under water foundations are not
The project objective is to test, verify and document the radar control installation aiming at defining the minimum requirements for this type of system capability. The project will also investigate
The objective of the project is on basis of participation in the IEA Task 29 MeXNext III to utilize the results from a new wind tunnel measurement campaign on a 4.5m rotor (summer 2014) for validation
Seagar aims to develop and demonstrate a device that enables bolts in wind turbine towers to be tightened automatically. The robot moves from bolt to bolt, tightens each bolt and documents all
Goals:
Improve knowledge of the market potential for Small Wind. Identify industrial business plans for
manufacturing and marketing. Improve knowledge of export by means of practical training and
issu
Blade replacement in wind turbines is costly due to the large cranes needed. The Single Blade Exchange without crane system will be able to do the replacement of blades without a mobile crane and with
LM WIND POWER A/S
Innovationsfonden
2015
2018
The project OPTI_MADE_BLADE has as its goal to develop and commercialize a new concept for procuction of large (>70m) wings for offshore windmills.
Innovationsfonden
2014
2018
The project INNOMILL works towards development of a more profitable and ultra flexible high precision system for fabrication of big elements in the wind mill industry. The goal is to reduce the cost
To be able to install wind turbines and for these to operate in Denmark or in Danish waters, they must be certified and serviced in accordance with the technical certification scheme for wind turbines
The main objective of this project is to advance the overall accuracy of the existing aero-hydroservo-
elastic computer codes related to offshore wind turbines and their substructures. This is
achieve
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2015 through participation in the Agreement Steering Committee ("Executive