Objectives: a) to address the problems related to balancing power in a system with a substantial part of fluctuating renewable power sources and b) to develop planning methods and operational
Developing of ChoosCOM for intelligent charging and communication with electric cars and is test it by 2400 families in 300 EVs. Main investigation is whether it is possible to move the charge of EVs
The target of the proposed project is to study how to integrate large amount of Renewable Energy Sources (RES) into the network, without having to reinforce the network. This is done by examining
The proposed pilot project will analyse the need for and potential of a marina power distribution hub with smart-grid functionality for the expected increasing share of electrical tour- and pleasure
The project aims to develop the communication technology based intelligent protection and post fault control methods for distribution systems. The developed protection and control methods would