This project quantified losses in the distribution grid and in directly connected motors due to harmonics. The extent of harmonic distortion was measured in 10 companies, and it was determined that
EnergiMidt will use their head quarter with 200 workplaces to demonstrate how modern, representive offcie building can be build and used a low energy class 1 building.
By combining solar cells, LED lighting, intelligent electronic and a newly developed inverter a functional model of a new outdoor lighting concept is produced. In the summertime it produces more
Hybrid fibre lighting systems comprise light-emitting diodes (LEDs) in combination with a solar fibre optic system and they have great energy savings potential. Over the expected lifetime of the light
The project has developed a method of how to integrate solar cells in inddor applications, called ''The iPV TOOL''. Three prototypes have been developed with different solar cells and different
The Master Class project was an educational programme for pupils from Gentofte and Fredensborg-Humlebæk municipalities involving a special course on energy production, on energy technology and on
Four different learning platforms are developed to gain a experienced based learning. The four platforms are tested in four classes in Helsingør and Rudersdal municipalities. Statement and behavioural
an online game has been developed to encourage teenagers to save electricity in their bedrooms. The game includes measuring the electricity consumption in the bedrooms of a 7th grade class (13-14 year
This project has attempted to verify a hypothesis that organisational psychology skills can contribute to making energy guidance for business customers more successful. The original intention to carry
The use of air-air heat pumps will be analysed to establish the technical and behavioural reasons why heat pump purchases do not always reduce the consumption of energy. Focus will mainly be on the
Energy consumption and indoor climate parameters are measured in to office buildings and there is developed a ventilation system with sensors, improvede fittings and building of ports. The new concept
This project has designed and built a pilot-scale cooling tower with an output of up to 100 kW for which good correlation has been ascertained between measured and calculated values for output and
The project follows up system optimisation project 338-009 by developing practical and web-based tools in the form of energy calculator, electric motor calculators and overall finances calculator for
The project examined to what extent radio and TV programmes and interactive websites can make the average family adjust its behaviour in a more climate-friendly direction. A CO2 calculator and a CO2
The project develops a simulation platform, including wind, wind turbine main components and power grid. The platform will enable the study of wind turbine performance, and will support key components
What causes cracks and damage on different length scales to become major cracks and damage which may develop into fractures in e.g. the blade of a wind turbine? DCCSM tests this aspect through