Indication of consumption of electricity via online wireless communication with a building electric meter
The project developed an electricity metering system capable of reading the electrical power load directly from the primary or secondary electricity meter. The electrical power load is shown as a mobile phone display. It was necessary to develop all hardware and related software for the system and resources were therefore not sufficient to study the originally planned user-related functionalities. The system is therefore solely tested on the associated energy consultants. The system proved to be most suitable for identifying no-load operation, e.g. in buildings with single high-energy consuming equipment (such as ventilation and pump equipment ) or production processes. (Energy 10)
Key figures
Category
Participants
Partner | Subsidy | Auto financing |
---|---|---|
Eniig a.m.b.a. | ||
KAMSTRUP A/S | ||
Teknologisk Institut | ||
Telefonline |
Contact
NRGI Rådgivning A/S
Bernhard Bangs Allé 23
DK-2000 Frederiksberg
www.nrgi-raadgivning.dk
Dam Wied, Martin , 38146427, raadgivning@nrgi-raadgivning.dk
Øvr. Partnere: EnergiMidt; Kamstrup A/S; Teknologisk Institut; Telefonline