Energy membrane
The conclusion and results after the completion of Phase 1 and 2 is that the expected losses in the soil layers where the energy is stored as potential energy will be approx. 100J/m3. It is expected that the energy loss in the soil layer on a 50x50 m demo installation (performed in Phase 3) would constitute <0.5% of the total energy stored. An elongation of less the <2% of the LDPE membrane was measured in the experiments. This is a lot less than the 7% elongation that the membrane was exposed to during the testing at danfoss, and further far below elongation of 500% that the supplier indicates. There were no changes on the membrane after the test. (Energy 11)
Key figures
Category
Participants
Partner | Subsidy | Auto financing |
---|---|---|
GODEVELOPMENT ApS | 0,28 mio. DKK | 0,10 mio. DKK |
Danfoss A/S | 0,04 mio. DKK | 0,12 mio. DKK |
MT HØJGAARD A/S | 0,11 mio. DKK | 0,12 mio. DKK |
Danmarks Tekniske Universitet (DTU) | 0,04 mio. DKK | |
Danmarks Tekniske Universitet (DTU) | 0,05 mio. DKK | |
Sloth-Møller A/S | ||
Sønderborg kommune |
Contact
Stavensbølgade 12
DK-6440 Augustenborg
www.aogjdevelopment.dk
Gramkow, Asger , 74470500, asger.gramkow@hecare.dk
Øvr. Partnere: Danmarks Tekniske Universitet. Risø Nationallaboratoriet for Bæredygtig Energi (Risø DTU).; Danmarks Tekniske Universitet. Institut for Byggeri og Anlæg (DTU Byg); GEO