The objective of the project was to investigate whether it was feasible and profitable to use a UPS system in connection with heating, cooling and electricity generation. A test system consisting of a
This project consisted of two parts: Establishment of test facilities and design of a model that describes how combustion in grate-fired power plant boilers takes place. The establishment of the test
This pre-project had the aim of establishing the basic technical knowledge to evaluate whether remote surveillance of the rotor blades of large off-shore wind turbines has technical and economical
Ice loading on wind turbine foundations is a design load in the inner Danish seas and straits. Relatively conservative design requirements/guidelines have so far been used for prediction of ice loads
Photovoltaic power supplied to the utility grid is gaining more and more visibility, while the worids power demand is increasing. Not many systems have so far been put into the grid due to their
A steam reforming unit has been developed during this project. The unit converts natural gas into reformed natural gas (RNG), which contain hydrogen. The RNG is combusted in an SI engine, which