In the BIPV Quality Cities project the total amount of PV systems with special focus on BIPV Quality, Solar Watch online monitoring and a combined focus electricity savings will amount to 3.850 kWp.
The main purpose of the planned Phase III (PVIB-III) is establishment of 1,5 – 2 MW of additional capacity primarily in terms of a large utility scale PV power plant of at least 1,5 MW. Thus very
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the