The purpose of the project is improve the efficiency of Power Take off systems for Wave Energy Converters, by analysing and optimizing a new PTO-system with multiple pressure lines. This includes
The project aims to develop the communication technology based intelligent protection and post fault control methods for distribution systems. The developed protection and control methods would
As a follow-up to PV Island Bornholm, Phase I project targeting implementation of 1 MWp of PV on the island of Bornholm, it is proposed to establish a phase II targeting an additional 1 MWp. The
Development/demonstration of economically viable small CHP plants based on gasification and steam raising through burning of the clean gas in once through steam boilers at high steam temperatures and
This project will identify and analyze the primary causes for formation particles in exhaust gas from gas engines at CHP plants. The project will be performed in close co-operation with manufacturers
In the proposed PV-Boost-2015 project coordinated by Gate 21 it is intended to realise 700 kWp innovative BIPV systems in zero energy and low energy class1 and 0 buildings in 7 dif-ferent cities in
Based on the results achieved in Phase 1 and 2 (the practical experiments and theoretical calculations of a 5x5 m energy membrane), this project shall further clarify and assess the technical and
The purpose of the project is to investigate the feasibility of electrochemical upgrading of biogas to pipeline quality in Denmark by means of Solid Oxide Electrolyser Cells (SOEC). Computer modelling
HI-CON A/S
ForskEL
2011
2011
As an initial step for FLOAT – a project on using UHPC for wave energy floaters - a study has been undertaken to investigate preliminary design of 2 types of floaters, essential properties of UHPFRC
The development of evacuated glazings approaches prototype production. Thus the basis for decision-making for commercial production will be created within approx. a year and a half.
The project aim is to develop an integrated SOFC module (standard module) which can be based on the most cost effective materials and manufacturing processes in order to reduce SOFC plant expenses.
This project was a pilot study which had as its main goal the evaluation of the use of a simulation method, based on strategic feedback models, to help understanding the evolution of a competitive
The Danish Energy Agency has renewed the Danish participation in the Implementation Agreement on Energy Technology Data Exchange (ETDE) for another 5-year period from January 26th, 1993.
Coordination of all Danish CADDET activities. Mailing of CADDET Newsletters, brochures and similar material. Organization of CADDET register inputs and liasion activities to the CADDET Centre and
The result of any risk analysis is uncertain, sometimes very uncertain. Despite of this fact, there is still a limited tradition for describing uncertainties, mainly due to the lack of appropriate
The activities in 1996 has to a large degree followed the budget proposal of 27 June 1995. During the year two IEA Executive Committee meeting were held, first in Finland and then in Germany. The
A combined systems development and demonstration programme has been initiated in order to be able to identify the necessary and adequate preconditions of a profitable production of fuel willow (salix)