The project co-financed Danish participation in a European partnership under the 6th framework programme to test whether gas from thermal biomass gasification can be purified sufficiently to be used
The main purposes of the project were 1) to develop new catalyst materials by applying ‘flame spray deposition’ (FSD); 2) to optimise state-of-the-art MEA materials and electrode structure; 3) to
This project, HAVDIM2004, aimed primarily at analysing already accessible measurement data from the two Danish offshore wind farms Horns Rev 1 and Nysted Offshore Wind Farm. The project focused on
The project developed a PV cell roof based on a modified industrial installation system for commercial nurseries. Components are non-framed PV cell modules with several novel features, including front
This project was meant to develop TK Energi’s stepwise gasification concept and improve full-scale demonstration at a plant in Gjøl. The pilot system was almost completed, but due to a delay, the
The objective of this project was to establish a wood-chip gasification system with a rated input of 600 kW. The system is an upgraded version of the Viking two-step gasifier developed at the
A scale 1:40 Wave Star wave energy converter has gone through more than 600 different wave tests in order to map the characteristics of the machine and optimize the annual energy production in a