As a follow-up to PV Island Bornholm, Phase I project targeting implementation of 1 MWp of PV on the island of Bornholm, it is proposed to establish a phase II targeting an additional 1 MWp. The
Development/demonstration of economically viable small CHP plants based on gasification and steam raising through burning of the clean gas in once through steam boilers at high steam temperatures and
This project will identify and analyze the primary causes for formation particles in exhaust gas from gas engines at CHP plants. The project will be performed in close co-operation with manufacturers
In the proposed PV-Boost-2015 project coordinated by Gate 21 it is intended to realise 700 kWp innovative BIPV systems in zero energy and low energy class1 and 0 buildings in 7 dif-ferent cities in
Based on the results achieved in Phase 1 and 2 (the practical experiments and theoretical calculations of a 5x5 m energy membrane), this project shall further clarify and assess the technical and
The purpose of the project is to investigate the feasibility of electrochemical upgrading of biogas to pipeline quality in Denmark by means of Solid Oxide Electrolyser Cells (SOEC). Computer modelling
HI-CON A/S
ForskEL
2011
2011
As an initial step for FLOAT – a project on using UHPC for wave energy floaters - a study has been undertaken to investigate preliminary design of 2 types of floaters, essential properties of UHPFRC
The project report is the contribution from the industry to an action plan for development and demonstration of CHP technology for solid biomass. The report aims to serve as inspiration and basis for
The central goal of the project is to increase access to the international research results, technological breakthrough and work partners within biomass and energy purpose. The purpose of this is to
If the overall energy policy targets shall be achieved there is a basic need for increased integration and coordination of renewable energy production facilities into the electric power system. More
The purpose was to ensure a better and more rewarding communication between researchers and practicians, to illustrate which projects may become good business, to follow up the ongoing projects and to
University of Copenhagen will in this international IEA – project; contribute to a better cooperation between teen leading bio mass – producers and the using countries. To expand the use of the
The project relates to participation in international corporation in an annex related to lEA (International Energy Agency) on stationary distributed generation of electricity in small power units. In
The project relates to participation in international corporation in an annex related to IEA (International Energy Agency) on stationary fuel cells for distributed generation of power in small units
The participants want to develop fully roof integrated solar collectors to fit all roof materials in shape and design. After development demonstration units should be made and tests to get approval
This project is the first phase in the development of an advanced test facility which will enable the wind power industry to develop and test new grid connection solutions, and validate the grid
The vision of this proposal is to solve the last two inherent problems faced by electric vehicles; A short range and a long recharging time. This is achieved by the development of a highly integrated
On basis of the successful work within the EUDP project ''The Albertslund Concept'' a follow-up EUDP project will be realised, focusing on the further development of the ''Solar Prism'' prototype
The project aims to develop and demonstrate concrete solutions for energy rehabilitation of the building envelope, installations and supplies, taking particular account of the architectural and