MeGa-stoRE, Optimising and Upscaling

Project description
MeGa-stoRE, Optimising and Upscaling: Production of synthetic natural gas.The project will develop a technology capable of upgrading biogas to the quality of natural gas by using wind power and thus create a connection between the electricity and the gas supply system. In order to upgrade the biogas, hydrogen is necessary and can be produced from wind power. In this way it will be possible to become independent from a fossil gas supply, and it will be possible to have a production of synthetic gas of equal quality. Synthetic gas can be used in the transport sector, where the big challenge is how to replace fossil fuels with renewable energy.The project will develop a method capable of using the CO2 in the biogas, and at the same time increasing the production of gas up to 54%. This way, the CO2-content of the biogas can be converted to methane by means of hydrogen produced from wind power. The method will reduce the CO2 emissions and increase the benefits from biomass, which will be a valuable and scarce resource in the future.

Key figures

Period:
2015 - 2016
Funding year:
2015
Own financial contribution:
0.81 mio. DKK
Grant:
5.93 mio. DKK
Funding rate:
88 %
Project budget:
6.75 mio. DKK

Category

Oprindelig title
MeGa-stoRE, Optimering og opskalering
Programme
ForskEL
Technology
Bio and waste
Case no.
12270

Participants

Danmarks Tekniske Universitet (DTU) (Main Responsible)
Partners and economy
Partner Subsidy Auto financing