ADDpower - Next Generation Power Supply

Development

20 kW RMFC platform with increased feasibility for higher power requirements in Material handling and large machinery APU requires a cost effective, compact and efficient solution.

Project description

The goal of the projected is to build a 20 kW RMFC (Reformated Methanol Fuel Cell)  platform that can be competitive in a higher power segment than the current 5 kW platform. The feasibility for higher power requirements in Material handling and large machinery APU (Auxiliary Power Unit) requires a cost effective, compact and efficient solution.

Modularization of current 5 kW platform stops at 2-3 modules in parallel as the component count and cycle/machine time increases dramatically.

The goals of the 20kW platform (per kW) are:

  • Reduce Bipolar plate costs by 50%
  • Reduce Reformer costs by more than 50%
  • Reduce MEA assembly costs 50%
  • Reduce stack Assembly time with 50%
  • Reduce the BOP (Balance Of Plant)  cost with 50%

Commercial & Demonstration Goals

  • Demonstrate a prototype in a target application
  • Demonstrate commercial feasibility
  • Plan further commercial roll out.

The project goals are in line with National PEM strategy and HT PEM roadmap. The targets are compared to a modular concept with e.g. 4 pcs of 5 kW systems.

Key figures

Period:
2015 - 2018
Funding year:
2014
Own financial contribution:
13.38 mio. DKK
Grant:
14.87 mio. DKK
Funding rate:
53 %
Project budget:
28.25 mio. DKK

Category

Programme
EUDP
Technology
Brint and fuelcells
Project type
Forskning
Case no.
64014-0525

Dokumenter

Participants

SERENERGY A/S (Main Responsible)
Partners and economy
Partner Subsidy Auto financing
SERENERGY A/S 8,44 mio. DKK 12,66 mio. DKK
Aalborg Universitet (Fredrik Bajers Vej) 6,43 mio. DKK 0,71 mio. DKK