Danmarks Tekniske Universitet (DTU)
ForskEL
2012
2014
The purpose is to achieve an energy pay-back time of less than one year for a complete grid-connected installation with polymer solar cells. The project comprises development of polymer solar modules
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently
FLOAT2 continues the development of the promising results obtained in FLOAT (2011-1-10649) where significant cost reduction for the WaveStar converter was achieved by substituting the building
The goal for this demonstration project to undergo an independent validation of wave energy machine "Rolling Upright" in the wave tank under controlled conditions, and in doing so have developed a
LEANCON Wave Energy
ForskVE
2012
2016
This ForskEL project will document the energy production of the wave energy converter MAWEC in real production mode. The overall project description is the same as in PSO project "Advanced Wave Energy
The purpose of the project is to design, build and test a 2 kW wave energy grid connected Lever Operated Pivoting Float LOPF buoy in the sea. The goal is to collect operational data on electric
RESEN ENERGY ApS
ForskEL
2011
2012
Wave energy, Lever Operated Pivoting Float LOPF, study of new taut moored buoy concept with direct electrical output. It will cover: Basic static theoretical optimisation of LOPF concept, design of
This project aims to support the integration and higher penetration of PV systems into the electrical power systems by advanced grid condition monitoring and grid control, Diagnostics and failure
The purpose of the project is improve the efficiency of Power Take off systems for Wave Energy Converters, by analysing and optimizing a new PTO-system with multiple pressure lines. This includes
As a follow-up to PV Island Bornholm, Phase I project targeting implementation of 1 MWp of PV on the island of Bornholm, it is proposed to establish a phase II targeting an additional 1 MWp. The
In the proposed PV-Boost-2015 project coordinated by Gate 21 it is intended to realise 700 kWp innovative BIPV systems in zero energy and low energy class1 and 0 buildings in 7 dif-ferent cities in
HI-CON A/S
ForskEL
2011
2011
As an initial step for FLOAT – a project on using UHPC for wave energy floaters - a study has been undertaken to investigate preliminary design of 2 types of floaters, essential properties of UHPFRC
Nordisk Folkecenter for Vedvarende Energi
ForskVE
2010
2011
The immediate project purpose is to support an accelerated enlargement of PV plants in Denmark by documentation and demonstration of two household PV plants with intended “lighthouse effect” and to
The purpose of the project is to develop, design and demonstrate a total concept with solar heat, borehole storage and heat pump for electricity regulation and up to 100% reduction of fossil fuels on
Problem description: The impact of high penetration levels of PV has different dimensions: i) In the distribution network, a high share of PV may require new approaches for voltage control as the
Establishment of a data base of O&M data for Wave Dragon established in Nissum Bredning. Large uncertainty exists about fatigue impact on single components used in a wave device caused by repeated
Waveenergyfyn v/ Henning Pilgaard
ForskEL
2010
2011