The costs of the management of seabed wind farm interaction is high, around one third of the total costs of the foundation of offshore wind farms. The aim of the project is to reduce these costs by
The Megavind Partnership´s vision is to maintain and develop Danish position as wind energy hub and home to the world´s leading companies and research institutes. Megavind´s objective is to identify
Interruptions of installation/uninstallation of wind turbine blades due to high wind speed are a huge cost for the wind industry, especially offshore. The objective of this project is to be able to do
A unique and dedicated software tool for small and medium size wind turbines - Online WAsP - is proposed to ensure inexpensive but accurate calculations of energy yields, noise impacts and financial
The objective of this project is to establish a novel type of wind load simulator where the true nature of wind can be simulated. The wind load simulator is central part of a new generation of test
The purpose is to develop and demonstrate a solution, an integrated Crane Basket, solving the challenge to get technicians access to blades on installed turbines – on- as offshore, for safe and
Task27 will focus on the research needs for understanding small wind turbines and their performance in environments of high turbulence including the built-environment. The subtasks are: Continue the
The purpose of ODIN-WIND is to develop and demonstrate a management tool for the decommissioning of offshore wind turbines. The tool will enable stakeholders to reduce the risk, cost and time spent on
To develop and demonstrate cost effective solutions for mitigating leading edge damages on blades on both existing and future wind turbines, based on Bladena’s patented technologies for mitigating
The IEA Wind Task 33 is dealing with databases for optimizing reliability and maintenance procedures for wind turbines. The aim is to address the different developments of data collection and failure
To contribute to development of new cold climate technology and stimulate new applications for Danish wind technology through IEA Task 19 through forming the basis for new international standards in
J Lemming Rådgivning
EUDP
2014
2015
The project has generally aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2014 through participation in the Agreement Steering Committee ("Executive
Objective of the project is to design, build and test a cost efficient and reliable wind turbine nacelle utilizing belts instead of a traditional gearbox. The partners will design and partly build a
The Megavind Partnership was founded in 2006 and the project 2008-2010 is a continuation of the earlier stages of the partnership. It has been the goal of the partnership to establish the foundation
The work is a part of the international cooperation to the IEA-Wind Implementing Agreement, and belongs to a new task - Annex 28: Social Acceptance of Wind Energy Projects. The project has collected
This project is motivated by the vision of being able to understand and model complex structural mechanisms and failure in large composite structures such as current and future wind turbine blades