The project is a part of the international cooperation on wawe power under IEA. The project will exchange information and experiences with wawe energy and asses ocean devices.
The goal for this demonstration project to undergo an independent validation of wave energy machine "Rolling Upright" in the wave tank under controlled conditions, and in doing so have developed a
LEANCON Wave Energy
ForskVE
2012
2016
This ForskEL project will document the energy production of the wave energy converter MAWEC in real production mode. The overall project description is the same as in PSO project "Advanced Wave Energy
The purpose of the project is to design, build and test a 2 kW wave energy grid connected Lever Operated Pivoting Float LOPF buoy in the sea. The goal is to collect operational data on electric
RESEN ENERGY ApS
ForskEL
2011
2012
Wave energy, Lever Operated Pivoting Float LOPF, study of new taut moored buoy concept with direct electrical output. It will cover: Basic static theoretical optimisation of LOPF concept, design of
The purpose of the project is improve the efficiency of Power Take off systems for Wave Energy Converters, by analysing and optimizing a new PTO-system with multiple pressure lines. This includes
HI-CON A/S
ForskEL
2011
2011
As an initial step for FLOAT – a project on using UHPC for wave energy floaters - a study has been undertaken to investigate preliminary design of 2 types of floaters, essential properties of UHPFRC
The purpose is to build a 500 kW wave energy demonstrator for the North Sea, as a first very important step towards commercialisation of wave energy. The EUDP funds mainly cover the very extensive
The project is based on a previously tested 1:40 model of a new type of wave energy converter, which has so far shown good properties. The objective of the project is to measure loads on the
The first step is to combine a hydrodynamic model of the waves with a dynamic model for the mechanical and hydraulic PTO system to achieve an understanding of the principles behind optimising energy
Optimization of power production and reliability of the Wave Star prototype in Hanstholm. The funding is given as a temporary additional per production hour, and is activated by attainment of
The project will test the abilities of the wave wing as an energy absorber. The test will be performed in the wave tank at AAU following preparation of measuring setup, component list and plan for