It is possible to reduce the Cost of Energy from Wave Energy Converters by utilizing Digital Hydraulic Power Take Off. The project aims at solving the main technical hindrance for enabling wave energy
The purpose is to secure a strong Danish representation in the international committee working with standardization through IEC TC-114. The project secures, that Denmark will be able to influence and
The project is part of the development of a tradition of cooperation for further development of wave energy, here, through the implementation of an exemplary development process. The project contains
The objective of the project is to develop a gyro electric converter unit for wave energy, and to test experimentally a 5 kW unit under realistic conditions.
The objective of this proof of concept project is to investigate the WaveSpring technology and how it can benefit wave energy converters (WECs). It is expected that the results from the project will
The objectives of the project are to design, test and develop cost efficient mooring solutions for large floating wave energy converters (WECs) and to build national competences in design and