The objective of this project is to develop, design, build, test, optimize and commission FPPs first full-scale wave PTO system. The resulting PTO design will be used to build four identical PTO units
The first purpose is to optimize and demonstrate Exowave wave energy concept in a coastal offshore environment, where the produced seawater under high pressure is led ashore and converted to fresh
The Ocean Energy Systems (OES) Task 10, Part II continues the work on verification and validation of numerical models of Wave Energy Converters (WECs) previously supported by EUDPJ.nr. 64017-05197.
The project will examine how concrete technology can be applied to large offshore wave energy devices in this case Wave Dragon and KNSwing. The study will examine solutions such as ordinary reinforced