The project relates to participation in international corporation in an annex related to lEA (International Energy Agency) on stationary distributed generation of electricity in small power units. In
On basis of the successful work within the EUDP project ''The Albertslund Concept'' a follow-up EUDP project will be realised, focusing on the further development of the ''Solar Prism'' prototype
The project aims to develop and demonstrate concrete solutions for energy rehabilitation of the building envelope, installations and supplies, taking particular account of the architectural and
Only large-scale projects with holistic approaches lead to sizeable results. The strategies suggested by Annex 51 reports can be grouped into three fundamental fields: reduction of final energy
The project is an international IEA - cooperation project. The project will embrace a problem which is often overseen when it comes to reduction of the energy need in buildings – and that is the end
This project develop new comfort ventilation solutions for buildings with a reduced use of energy. The user will experience better comfort and reduced costs for electricity and heating.
The project's aim was to develop system solutions to extensive additional insulation and air tightening of the building envelope in the renovation of existing buildings and to develop methods for the
The objectives of the project is to break down the barriers for energy renovation of private owned houses in Denmark by: assisting in further development of 4 key energy technologies, exploiting their
It is theoretically possible to achieve a reduction of 19% of the total agriculture's energy consumption by reducing the energy consumption for heating and for electric motors according to reduction
The purpose of the project is to develop technologies, which can optimize the thermal storage of concrete constructions. The concrete is being tested in full scale in EnergyFlexHouse at the institute
This project quantified losses in the distribution grid and in directly connected motors due to harmonics. The extent of harmonic distortion was measured in 10 companies, and it was determined that
EnergiMidt will use their head quarter with 200 workplaces to demonstrate how modern, representive offcie building can be build and used a low energy class 1 building.
By combining solar cells, LED lighting, intelligent electronic and a newly developed inverter a functional model of a new outdoor lighting concept is produced. In the summertime it produces more
Hybrid fibre lighting systems comprise light-emitting diodes (LEDs) in combination with a solar fibre optic system and they have great energy savings potential. Over the expected lifetime of the light
The project has developed a method of how to integrate solar cells in inddor applications, called ''The iPV TOOL''. Three prototypes have been developed with different solar cells and different
The Master Class project was an educational programme for pupils from Gentofte and Fredensborg-Humlebæk municipalities involving a special course on energy production, on energy technology and on
Four different learning platforms are developed to gain a experienced based learning. The four platforms are tested in four classes in Helsingør and Rudersdal municipalities. Statement and behavioural
an online game has been developed to encourage teenagers to save electricity in their bedrooms. The game includes measuring the electricity consumption in the bedrooms of a 7th grade class (13-14 year
This project has attempted to verify a hypothesis that organisational psychology skills can contribute to making energy guidance for business customers more successful. The original intention to carry