The project objective was to improve and consequently optimise the basis for design of offshore wind turbines. This was done through mapping of wind, wave, ice and current, by correlations of these
The purpose of the project was to construct and test a 2.5kW photovoltaic inverter (DC/AC) based on the same segment-switched stair-step concept developed under the EFP94, which was developed for 10