The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
The objective of Task 25 is to analyse and further develop the methodology to assess the impact of wind power on power systems. The Task has established an international forum for exchange of
The project has generally aim to support Denmark´s participation in the “IEA Wind Energy R & D Implementing Agreement” in 2013 through participation in the Agreement Steering Committee (“Executive
Currently, individual wind turbines can estimate their possible power of during down-regulation. For large offshore wind power plants, the sum of those signals is larger than the possible power of the
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The overall objective of the project is to develop a cost-efficient Lidar wind sensor to be integrated on individual wind turbine in order to maximize power production and minimize dynamic load on the
The purpose is to develop and demonstrate methods for cableinstallation, which via improved cable
fabrication and installation can reduce costs for installation of array-, infield- and export cables
To develop and demonstrate the value of a yaw control kit for wind turbines, which continuously measures
the wind direction in front of a wind turbine and subsequently turns the turbine almost
To develop, prepare for market and demonstrate an applicable method for regaining operational life of
installed wind turbine blades with structural defects based on Bladena’s patented technologies for
To improve the efficiency of wind turbine and wind turbine farms using synchronized sensors on wind
turbines, their wings, and in wind fields. The technology is used in development, test, modeling
Based on participation in the IEA Annex 29 Mexnext II, the objective is to validate and improve a number of different aerodynamic and aeroelastic numemrical models used by both research institutions
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently