The objective of BLATIGUE-2 is to develop fast and efficient fatigue testing methods for large wind turbine blades, to develop smart equipment to excite the blades under such tests and to increase
The purpose of the project is to increase the liability of blades in operation by installing RTZ Solution. Further, the purpose is to reach higher cost efficiency and higher AEP for the wind turbine
Fatigue of fiber rope is crane applications is not well established, why extensive full-scale testing is currently required for using fiber ropes in crane applications. The main objective of this
LERCat enables leading edge roughness (LER) repairs of wind turbine blades at the right time, yielding a 1 bn DKK/year gain across the partners’ turbine fleets. This is achieved by establishing an
The project involves the development and maturement of a drone charging station and a drone system. The combined system should then be capable of conducting autonomous wind turbine inspections and
Managing offshore corrosion is a subject that is heavily regulated and combined with several industry standards that must be followed to ensure the structure integrity of the assets. Yet, whilst, and
The purpose of IDEA is to establish reference site conditions and wind reference wind farm designs for floating wind turbines. The project follows the international IEA project on wind farm design and
The overall objective of this project is to further adapt, improve and expand the existing operational tracking technology that Claviate has developed to cover the entire onshore wind turbine
We aim to demonstrate that a radically new blade technology combining jointed modular blades with advanced tips made with additive manufacturing can enable increased rotor sizes by up to 20% and lead
This main objective of this project is to demonstrate procedures that can quantify the risk of failure, the remaining structural reliability and the maintenance costs upon extending the life of
The long-term goals of OES Task 10 are:
1. To assess the accuracy and establish confidence in the use of numerical WEC models
2. To determine a range of validity of existing computational modelling
IEA Wind Task 28” on Social Acceptance of Wind Energy Projects is a working group involving several countries, including the USA, Germany, Denmark, Switzerland, Japan, Ireland, Italy and the
Because these hours are incoherent and unpredictable, a constant availability of power is imperative and as a result the generator has to be operating around the clock. Thus Power Pack will contribute
A wind turbine power converter includes power modules mounted on cooling plates, which cool the component. The heat is transferred to the ambient by use of a water circuit and an air cooler. The
The long-term goals of OES are:
1. To assess and establish confidence in the use of Wave Energy Converters
2. To engage and integrate Danish industry in international initiatives
3. To identify
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2018 through participation as Alternate member in the Agreement Steering
The project will design and test innovative blade tips for wind turbines which can increase the existing rotor size, producing up to 8% more energy per year, while regulating loads in a smart way.
Every wind farm project requires accurate resource assessments to evaluate the energy yield and profitability, but for projects in hilly, mountainous or forested areas the measurement campaigns can be