The primary objective of IEA Wind TCP Task 26 is to generate and provide information on cost of wind energy in order to understand past, present and anticipated future trends using consistent
The goal of the WindWeld project is to increase the metal fatigue performance of large welded steel structures using an automated device, which is developed and demonstrated in the project, to
The purpose of DMDS – Demonstration of Modular Drive System is to develop and demonstrate a new type of drive technology for large scale test benches. The Modular Drive System (MDS) will allow for the
The purpose of the CORTIR project is to gather the value chain of the wind industry with the goal of reducing the costs and risks concerning wind turbines in the field. During the project a Decision
The project supports in 2019 the Danish Energy Agency's participation in the International Energy Agency (IEA) Wind TCP Executive Committee (ExCo) and strengthens communication and network activities
RELIABLADE develops and demonstrates techniques to create a unique Digital Twin for each individual wind turbine blade with their unique defects and imperfections. The Digital Twin tracks the current
The project comprises Danish participation in IEA task 29 which overall objective is to facilitate an international collaboration on validation and further development of wind turbine simulation
The GASP project aims at bringing down the Levelized Cost of Energy by reducing uncertainty and providing quality data for turbine siting parameters. This will ensure that the turbines’ structural
With the growing importance of integration of wind energy into power systems, the scope of Task 25 is proposed to be enhanced and broadened and to include collaboration with integration of solar
The objective of this project is:
1. High quality measurements with a high service level
2. Accelerated wind tunnel measurements by increasing the turnaround cycles with
standardized and automated
Denmark has long been a leading country in wind power forecasting. This project enables a large
Danish participation in the IEA Wind Task 36 Forecasting. Research organisations and
commercial
The cost of offshore jacket foundations needs to be lowered to make this foundation concept competitive. The purpose of the project is to mature and develop a novel offshore jacket node concept, using
The purpose of the project is to strengthen the numerical modelling ability of the HAWC2 model
within 1) long-period motion from nonlinear waves 2) damping from soil 3) aerodynamics for
turbines with
The goal of this project is to perform a trial installation of a full-scale prototype of a suction bucket for wind turbine jacket foundations. The installation is performed at an offshore site near
Reduction of the cost for installaion of WTG towers with 50% at the same time supporting installation for even larger WTG and tower sizes in the future
The Megavind Partnership was founded in 2006 and the project 2008-2010 is a continuation of the earlier stages of the partnership. It has been the goal of the partnership to establish the foundation