The purpose is to build a 500 kW wave energy demonstrator for the North Sea, as a first very important step towards commercialisation of wave energy. The EUDP funds mainly cover the very extensive
The project has prepared the establishment of a partnership that can develop intelligent solutions into a potential growth area for national business and employment. The project has developed a
The project is based on a previously tested 1:40 model of a new type of wave energy converter, which has so far shown good properties. The objective of the project is to measure loads on the
The object is to provide input for the existing international standardisation efforts in flexible control of distributed power systems. This includes IEC 61850 and IEC 61970. The work must involve
The first step is to combine a hydrodynamic model of the waves with a dynamic model for the mechanical and hydraulic PTO system to achieve an understanding of the principles behind optimising energy
Optimization of power production and reliability of the Wave Star prototype in Hanstholm. The funding is given as a temporary additional per production hour, and is activated by attainment of
The project will test the abilities of the wave wing as an energy absorber. The test will be performed in the wave tank at AAU following preparation of measuring setup, component list and plan for
About 20-25% of the energy used in the EU is utilised for room heating. Even a few % improvement will represent a large quantity of energy saving and CO2 reduction. Thecalculation tool implemented on
By 2015, the city of Frederikshavn must consume 100% renewable energy. The goal is to test an integrated energy system in which electricity, heating and transportation interact intelligently without
The CanDan1.5 project is part of the Canadian/Danish CanDan collaboration and the purpose is to: - Analyze state-of-the-art and future prospects for hydrogen & fuel cell power balancing concepts &