The goal of the project is to formulate alternative separation concepts that can replace the traditional water evaporation in the sugar production. The concepts consist of one or more existing or
The results of the project indicate that it will be possibel within a few years to build a highly insulated glazed building envelope. It was however not possible within the schedule of this project.
The main purpose of the present project has been to test a new type of MCFC unit developed in previous phases of the project. Various parts of the plant e.g. MCFC stack, reformer, catalytic burner
The main purpose of the project was to identify measures for lowering the price of straw delivered to power plants, mainly by developing a new high density straw press for Hesston size bales. The aim