The purpose ofthe project is to conduct a feasibility study on how biogas can recover energy and nutrients from urban waste in a sustainable way (economically, environmentally and politically). The
To be able to install wind turbines and for these to operate in Denmark or in Danish waters, they must be certified and serviced in accordance with the technical certification scheme for wind turbines
This project includes completion of project 2008-1-0164 "Selective Hydrolysis of Sludge, phase 2".The mentioned project showed profound effect of Selective Hydrolysis on digestion and biogas
DC chargers represent an attractive option for public stations, but increase of the system peak consumption may lead to the overload of certain sections of transmission and/or distribution network.
The project aims to determine how new renewable energy sources can be included in the electricity system, in operational planning and in the supply of reserve and regulating power. It will be
Cybersecurity in smart grids is a rising challenge: ICT systems are becoming more prevailing and complex, the external threat is increasing and the available countermeasures are not sufficiently
Dansk Energi
ForskVE
2014
2017
The scope for the EVCOM project is to specify harmonized data formats for exchanging data for controlling, regulating and billing EV charging in Denmark. The data formats must support a wide number of
HPCOM project supports the development and implementation of information- and data- communication infrastructure within the area of individual heat pumps. The project covers data communication from
The SUS platform will be established as a part of DOLL – Green Lab for Lighting and Photonics, which has enjoyed an overwhelming interest from global media as well as the lighting industry and
The main objective of this project is to advance the overall accuracy of the existing aero-hydroservo-
elastic computer codes related to offshore wind turbines and their substructures. This is
achieve
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2015 through participation in the Agreement Steering Committee ("Executive