De Nationale Geologiske Undersøgelser for Danmark og Grønland
EFP
1996
1998
On the basis of geophysical surveys the main, presently prospective area in the western part of the Nuussuaq Basin has been constrained. This region is characterised by a thick sedimentary succession
The main objective of the Task is to promote daylight-conscious building design with the aim of realising energy savings and visual comfort and amenity value of the building.
The main objective of the project, where phase 1 or 2 is carried out, is to combine geological description of fractures, chalk types and rock mechanics properties. A main objective is also to
A typical full field geostatistical model consist of more 500 106 cells each describing an oil reservoir's porosity and permeability. This is far above the capacity of today's reservoir simulator
De Nationale Geologiske Undersøgelser for Danmark og Grønland
EFP
1996
1997
The Jurassic succession in the Gertrud Graben has been studies using multi-channel seismic data and well data. The study provides a detailed interpretation of seismic lines and use of seismic
The main aim of the project is to establish knowhow about thermal gasification of biomass - especially straw. This project will be focused on: 1) Decomposition of tar by non-catalytic processes. 2)
The full-scale measurements of waves, currents, and hydrodynamic response of vibrating pipes conducted in the Tyra Field in the year 1994 have been analysed. The results have lead to a far better
The basic idea of the project was to obtain two-dimensional saturation pictures of the cross section of a borehole core by use of transmission measurements with parallel gamma-beams through the core
The objectives of this project have been to develop catalysts, strategies and methods to minimise the emissions. The project has investigated the influence of engine parameters on emissions from lean
The bulletin presents a method for calculating the gross energy consumption of a building. The net heat demand for space heating, ventilation and domestic hot water should be calculated. Next
This project takes stock of experiences with often used ventilation systems for new housing with regard to energy efficiency, indoor climate, comfort, operation and maintenance and also assesses the
In accordance with its purposes the research project gives an account of how it is possible in addition to building improvements and presumable low maintenance costs, to achieve energy savings.
The purpose of the project is related to the rebuilding of existing buildings: - To develop an inventory tool for energy related environmental interventions. - To collect environmental life cycle data
New, super-insulating transparent and translucent glazing offers new pespectives for the use of glass in architecture. New facade idioms, spatial and light effects and low energy consumption may be
In the project, the consulting engineering companies Carl Bro A/S and Birch og Krogboe A/S have tested a prototype of SBI's integrated computer system for analyzing the energy and indoor climte
The aim has been to investigate and to develop thermally improved windows based on an evaluation of the energy balance of the window, i.e. the total influence of the window (heat loss and transmitted
In the project detailed programs for calculating the effect of thermal bridges in building envelope constructions have been validated by use of measurements and methods for calculating the total heat