To develop, design, calculate system integration and business cases for pit thermal storages fitting into all kind of district heating and cooling systems
We will participate in the final part of the work with task 3 under annex XV. Task 3 covers advanced methods, operation and risk aspects as well as innovative solutions for excess heat recovery.
The
Blue Atlas Robotics is developing an underwater robot that autonomously images large underwater structures, including ships and harbor quay walls, to radically improve the quantity, quality, and
The purpose of the power buoy development program is to support the green transition of the global maritime industry by eliminating and removing CO2 pollution and particle emission caused by the
MAN Energy Solutions has demonstrated a method to premix gaseous fuels like methane and ammonia in two-stroke engines for large ships. The project will investigate flow physics and injection
LED iBond aims to develop and demonstrate a new generation of the Tracy Panel, in which the lighting structure serves as conductor for the electricity for the LEDs but also as IoT infrastructure.
Udvikling af tre højtemperaturvarmepumpeteknologier med fremløbstemperaturer på op til 200 °C – hver med en varmeydelse på 500 kW. Systemerne bruger damp, kulbrinter og CO2 som kølemiddel. Udviklingen
Measurement components, mounted in ducts in a ventilation system, increase the system’s pressure drop and hence energy use. This project introduces a newly developed sensor type for measuring of air
The project develop a new method to reduce the electricity consumption to ventilation, heating and cooling in large high ceilinged rooms by using controlled draft/mixture by mixing fans.
The project will develop new monitoring systems for laboratory and industrial measurements following the endurance test. Results shall show the effect of the test and if it can predict early failures
The development of evacuated glazings approaches prototype production. Thus the basis for decision-making for commercial production will be created within approx. a year and a half.
Coordination of all Danish CADDET activities. Mailing of CADDET Newsletters, brochures and similar material. Organization of CADDET register inputs and liasion activities to the CADDET Centre and
The aim of the project was to demonstrate ventilated solar walls in practice, including satisfactory architectural and structural adjustment to a certain building.
The aim of this project was to design and build an apparatus for evacuation and assembly of aerogel glazings up to 60 cm x 60 cm based on the proposed method. The key element of the method is the
The purpose of the project is to produce the technical basis for dimensioning and developing motor/pump systems, so that the total concept is energy-optimized for domestic heating.
Forskningscenter for Elektroteknisk Energiomformning E/F (CETEC)
EFP
1996
1998
One of the results is, that the separation depend not on the gravitational force itself but on the exponent of the square of the peripheral speed of the centrifuge.
The objective of the project was to develop new trawls for the Russian fleet, that would save energy per unit of catch through the application of new designs and modern materials.
The aim is to analyse and evaluate appropriate means of establishing a working interaction between different intelligent components, e.g. for energy management purposes. The interaction between
The main objective of the Task is to promote daylight-conscious building design with the aim of realising energy savings and visual comfort and amenity value of the building.