Building on the results achieved in a first EUDP project, the purpose of this project is to finalise the development and testing of the technologies needed to produce extra – tall 3D printed wind
Power Curve, the Technical University of Denmark and Statkraft collaborate in order to develop a trailing edge serration product for wind turbine blades that offers increased noise reduction fea-tures
The purpose of the Thunderbolt project is to be able to deliver a fully commercialized service on subscription to the wind energy market after successful project execution, making it possible to
The project is dedicated to enhancing the efficiency and cost-effectiveness of foundation design for offshore structures such as windfarms and energy islands. The envisioned solution involves the
The project allows Floating Power Plant (FPP) to optimise and further develop novel floating wind concepts. The output will be three large demonstration activities and six innovations, including a
Aeromine is a novel, building integrated windenergy system intended to compete with or supplement industrial rooftop solar PV. The EUDP project will improve the understanding of- and demonstrate how
Formålet med projektet er, at have mere pålidelige WTG-vinger i drift med forlænget levetid, sænke OPEX og optimere AEP, gennem anvendelsen af en risikobaseret tilgang. Hvis vingerne kan forblive i
The aim of the project was to analyze the environmental effects of wind turbines during manufacturing and after disposal in a long term perspective and to give societal recommendations in relation to
The purpose of the project is to verify, refine and develop micrometeorological tools for the estimation of load-critical wind conditions in landscapes in Denmark and Europe, where wind turbines (and
The aims of the project was enhancing and further developing a model system capable of analysing and predicting the wind and the potential wind energy in Denmark.
The overall objective with the project has been to develop and verify a model for assessment of the interaction between a wind farm and the power systern.
The project has comprised the following six milestones: a) status on 2D and 3D CFD computations, b) implementation of improved aerodynamic and structural sub models in the aeroelastic codes FLEX4 and