Denmark has the 1. of January 2013 joined the IEA Heat Pump Programme (HPP). DEA has designated Technological Institute to be representative of HPP's Executive Committee's work.
As different renewable energy sources, like solar, wind and biomass, become more widespread as energy sources in the different energy grids in urban areas, the aim of the project is to investigate how
The future electrical distribution systems will use more and more direct current (DC). The research project focuses on the development of future intelligent direct-current (DC) microgrids which is
The public-private partnership Smart Energy Networks will support energy policy goals as well as good and sustainable growth conditions for Danish trades and industries. The partnership will enable
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
Feasibility study of an offshore energy storage facility with integrated renewable energy production (wind, wave and solar). Design geometry is verified and total costs estimated. Earning potential in
The purpose of the project is to carry out detailed planning/engineering and part-implementation of an off-grid renewable energy solution for Livø Island. A previous project has - based on e.g. the
TotalFlex is a demonstration project that intelligently manages flexible consumption and production. This is done by flex-offers from a technical and commercial VPP, which are traded on a marketplace
NEAS ENERGY A/S
ForskEL
2012
2014
The aim is analyzing, developing and demonstrating a smart grid ready Virtual Power Plant controller that includes the complex challenges of large scale demonstration with demand flexibility
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
This project is focusing on the electricity consumption of the agriculture on Samsø. The agricultures/farms are going to be active players in Smart Grids together with other manufacturing industries
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
Waveenergyfyn v/ Henning Pilgaard
ForskEL
2012
2012
Århus Vand og Spildevand
ForskEL
2012
2014
The purpose of the project is to map and assess the potential for a water utility to adapt current operating practices to respond to the needs of a the electricity system through a flexible demand
Implementation of 10,600 m2 solar collectors, 19,000 m3 borehole storage and a heat pump to supply the existing combined heat and power plant in Brædstrup, Denmark
To develop and test a market based smart city energy management platform using Kalundborg as fullscale
demo. Grid-responsive energy services are aligned with intelligent grid operations and dynamic
The project aims to develop an energy-cost-effective artificial light management system, which optimizes
plant growth in relation to energy costs and also integrates greenhouse horticulture with the