Every wind farm project requires accurate resource assessments to evaluate the energy yield and profitability, but for projects in hilly, mountainous or forested areas the measurement campaigns can be
Small cracks in wind turbine bearings are responsible for some of the most expensive wind turbine failures. Today, there are no certain methods of preventing the cracks, but a new project led by DTU
A new project will develop cheap battery systems that, by integration with wind turbines and solar cells, will increase the stability of the electricity grid and facilitate a higher share of
EEEHy aims to generate the knowledge that will result in the demonstration of a game- changing high temperature and pressure alkaline electrolyzer. The novel materials, electrode architecture, stack
Renewable energy to be stored in floating flywheels. Better magnets can help store renewable energy from solar cells and wind turbines in magnetic flywheels. The new technology for energy storage
The MultiCon project aims to foster a paradigm shift in wind energy by developing disruptive storage solutions based on a novel Power Management System which allows monitoring and control of batteries
The aim of this project is to demonstrate that electricity can be produced from salty geothermal water at very low cost. To this purpose, we will build a full scale demonstration system and test it at
To bring the technology readiness level from 6 to 8 by implementing preventive maintenance on BOP components, optimizing control systems, incorporate a final steam clean up, introduce a more cost
The primary aim of this project and of course of the Annex is to increase the acceptance of heat pumps (as air-to-water, water-to-air, air-to-air and brine-to-water units1) for comfort purpose with
The development of evacuated glazings approaches prototype production. Thus the basis for decision-making for commercial production will be created within approx. a year and a half.
The project aim is to develop an integrated SOFC module (standard module) which can be based on the most cost effective materials and manufacturing processes in order to reduce SOFC plant expenses.
This project was a pilot study which had as its main goal the evaluation of the use of a simulation method, based on strategic feedback models, to help understanding the evolution of a competitive
The Danish Energy Agency has renewed the Danish participation in the Implementation Agreement on Energy Technology Data Exchange (ETDE) for another 5-year period from January 26th, 1993.
Coordination of all Danish CADDET activities. Mailing of CADDET Newsletters, brochures and similar material. Organization of CADDET register inputs and liasion activities to the CADDET Centre and
The result of any risk analysis is uncertain, sometimes very uncertain. Despite of this fact, there is still a limited tradition for describing uncertainties, mainly due to the lack of appropriate