The overall target for this project is to develop an industrialized concept for Building Integrated Solar PV-BIPV that visualizes a number of added values, minimizes additional costs and thus paves
Projektet omfatter assistancen til opgaver i forbindelse med Danmarks medlemskab af IEA-OES i 2016:
I lighed med 2014 dækker ansøgningen deltagelse i de årlige EXCO møder
30 de ExCo Meeting
The overarching program objective is to reduce the overall offshore wind cost of energy by merging the technological leadership of three offshore industry leaders across three participating countries
The lubricating system on a large two-stroke diesel engine consists of a unit that continually adds new oil to each cylinder. Unlike in a four-stroke engine the oil is only used once. Sorne of the
The aim of the project is to accelerate the use of large electric heat pumps for district heating through industrial cooperation, research and experimental development. This is the second phase of a
Measurements were made in five swimming baths, and energy savings were achieved using new filters, pumps, water treatment control depending on bather load, etc. In a 50 metre pool, electricity
In the EU subsidised project, under the Fifth Framework Programme, a gasification plant was established in Gjøl based on TK Energi’s staged gasification technology.
The project aimed to evaluate a waste gasification facility concept and plan selected components for a pilot facility. The project constructed a horizontal facility in which fuel and oxygen are
For at reducere CO2 udslip har den danske regering besluttet at fra 2010 skal 29% af al strøm leveres fra alternative energikilder. Vindenergi indgår som et væsentligt led i opnåelsen af dette mål
The project, 'Transparent PV modules - shading devices of the future' is based on the vision of a shading device which is energy producing, sun shading and transparent. This solar cell can be achieved