The object is to provide input for the existing international standardisation efforts in flexible control of distributed power systems. This includes IEC 61850 and IEC 61970. The work must involve
The first step is to combine a hydrodynamic model of the waves with a dynamic model for the mechanical and hydraulic PTO system to achieve an understanding of the principles behind optimising energy
Optimization of power production and reliability of the Wave Star prototype in Hanstholm. The funding is given as a temporary additional per production hour, and is activated by attainment of
The project will test the abilities of the wave wing as an energy absorber. The test will be performed in the wave tank at AAU following preparation of measuring setup, component list and plan for
About 20-25% of the energy used in the EU is utilised for room heating. Even a few % improvement will represent a large quantity of energy saving and CO2 reduction. Thecalculation tool implemented on
By 2015, the city of Frederikshavn must consume 100% renewable energy. The goal is to test an integrated energy system in which electricity, heating and transportation interact intelligently without
The CanDan1.5 project is part of the Canadian/Danish CanDan collaboration and the purpose is to: - Analyze state-of-the-art and future prospects for hydrogen & fuel cell power balancing concepts &
A number of instruments, Internet, media campaigns, boxes displaying electricity prices (SEE1) and spot contract has been tested for households to shift their electricity consumption to times when
The pier-based Wave Star Energy test system is now ready for installation at Roshage pier in Hanstholm. For security reasons, the unit was moved into open waters west of the pier. A high footbridge
The goal of the project is to develop, test, validate and evaluate a novel control architechture for optimised operation and seamless integration of micro CHP based on a generic virtual plant (VPP)
The project united a wide circle of scientists, experts and industrial partners with varying competences and specific experience to hear their visions for how Denmark should develop new long-term
The present R and D will be used to build a 1:10 scale model of a single AquaBuOY and test and measure its performance in a range of sea conditions at the testsite in Nissum Bredning on 5 meters deep
The project has shown that there is potential for particularly demand response energy consumption within the industry. If businesses offer this potential on markets it is required that the payment is
Danish greenhouses have a relatively high level of electricity consumption for grow light. Part of the electricity consumption is flexible, and the main purpose of the project was to find out if the
More than 500 households with electric heating participated in a demonstration project about demand response. Participants paid for electricity based on spot prices. The groups notified of the next
The project studies two issues in distribution systems 1)Normal Operation Optimization models the load optimal response to electricity price, power system constraint impacts. 2)Control Strategies in
The operating responsible for the Danish electricity grid (Energinet.dk) asks for more competitors in the liberalised market for fulfilling national obligations for contracts of standby regulating