The IDE4L project will define, develop and demonstrate the entire system of distribution network automation, IT systems and applications for active network management. The IDE4L-DK Top-Up project is
An increasing amount of power electronic based units in electric power grids give rise to protection and control difficulties during disturbances. A solution is to install synchronous condensers
This project will conduct experimental research in order to identify the potential of a novel energy storage technology. The concerned technology is based on heat accumulation, in the phase transition
The project will analyze the role of distributed energy storages in future energy systems. The goal is a more economical efficient integration of renewable energy. The project secures Danish
The aim of the project is to carry out a 360 degree feasibility study of a value chain for local production of liquefied bio gas to provide both the Samsø ferries and vehicles on land with fossil free
The project extends DTU contribution in the FP7-project 'ELECTRARES´ connected at all voltage levels requires new approaches for control coordinating millions of devices. The project establishes
As different renewable energy sources, like sun, wind and biomass, become more widespread as energy sources in the different energy grids in urban areas, the aim of the project is to investigate how
To develop new methods and solutions for design and dimensioning of the future cost-effective multi-carrier energy system (electricity/thermal/transpon) based on Nordhavn as a globally visible real
The Local Energy Storage Project will develop a local power storage solution based on a new electronic power conversion and control concept and commercial batteries to enable higher production of grid
The project will analyse the role of distributed energy storages in future energy systems. The goals are to find more economical efficient integration of renewable energy and to answer the question
Cybersecurity in smart grids is a rising challenge: ICT systems are becoming more prevailing and complex, the external threat is increasing and the available countermeasures are not sufficiently
Implementation of 10,600 m2 solar collectors, 19,000 m3 borehole storage and a heat pump to supply the existing combined heat and power plant in Brædstrup, Denmark
To develop and test a market based smart city energy management platform using Kalundborg as fullscale
demo. Grid-responsive energy services are aligned with intelligent grid operations and dynamic
The project aims to develop an energy-cost-effective artificial light management system, which optimizes
plant growth in relation to energy costs and also integrates greenhouse horticulture with the