Through active participation in the ETDE Executive Committee and in the technical working group influence was exerted on the implementation of the agreement IEA Energy Technology Data exchange, so
The goal is to provide governments with the 'tools' to assess the performance of SSL sources with appropriate standards and test methods. 1. Quality: 1.1 Product definition categories. Key performance
The main objective of this project was to prepare the first ever REnescience commercial scale demonstration plant to be ready for operation before 2013.
New energy technologies enabling replacement of fossil fuels must be developed during the next decades. Gasification has been identified is an important contribution. This technology is expected to
The project has resulted in the development of a 10 kW fuel cell system called H2Drive (R) for vehicles for material handling vehicles. H2Drive (R) containing fuel cell and battery pack, and can
The plan is to develop a PEM (Proton Exchange Membrane) fuel cell stack with integrated basic functionality for micro combined heat and power. Balance of plant components are integrated into the fuel
The purpose of the projekct is to duce cost of energy in the design, production, transport, installation and maintenance of monopile foundations for large offshore wind turbines. The primary goal is