The consortium will improve the energy collectors and energy efficiency on the most weight and cost-efficient wave energy system currently in development. The EUDP project targets the primary CAPEX
A scale 1:40 Wave Star wave energy converter has gone through more than 600 different wave tests in order to map the characteristics of the machine and optimize the annual energy production in a
The objective is to develop a prototype design of a wave power converter based on the Point absorber system AquaBuOY in cooperation between RAMBOLL and Aqua Energy.