The long-term goals of OES Task 10 are:
1. To assess the accuracy and establish confidence in the use of numerical WEC models
2. To determine a range of validity of existing computational modelling
The long-term goals of OES are:
1. To assess and establish confidence in the use of Wave Energy Converters
2. To engage and integrate Danish industry in international initiatives
3. To identify
A scale 1:40 Wave Star wave energy converter has gone through more than 600 different wave tests in order to map the characteristics of the machine and optimize the annual energy production in a