The objective of this project is to develop, design, build, test, optimize and commission FPPs first full-scale wave PTO system. The resulting PTO design will be used to build four identical PTO units
The first purpose is to optimize and demonstrate Exowave wave energy concept in a coastal offshore environment, where the produced seawater under high pressure is led ashore and converted to fresh
The Ocean Energy Systems (OES) Task 10, Part II continues the work on verification and validation of numerical models of Wave Energy Converters (WECs) previously supported by EUDPJ.nr. 64017-05197.
A scale 1:40 Wave Star wave energy converter has gone through more than 600 different wave tests in order to map the characteristics of the machine and optimize the annual energy production in a