The project will examine how concrete technology can be applied to large offshore wave energy devices in this case Wave Dragon and KNSwing. The study will examine solutions such as ordinary reinforced
The long-term goals of OES Task 10 are:
1. To assess the accuracy and establish confidence in the use of numerical WEC models
2. To determine a range of validity of existing computational modelling
The long-term goals of OES are:
1. To assess and establish confidence in the use of Wave Energy Converters
2. To engage and integrate Danish industry in international initiatives
3. To identify
The pier-based Wave Star Energy test system is now ready for installation at Roshage pier in Hanstholm. For security reasons, the unit was moved into open waters west of the pier. A high footbridge