The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
DanWEC Fonden
Green Labs DK
2013
2013
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently
FLOAT2 continues the development of the promising results obtained in FLOAT (2011-1-10649) where significant cost reduction for the WaveStar converter was achieved by substituting the building
The purpose is to build a 500 kW wave energy demonstrator for the North Sea, as a first very important step towards commercialisation of wave energy. The EUDP funds mainly cover the very extensive
The project is based on a previously tested 1:40 model of a new type of wave energy converter, which has so far shown good properties. The objective of the project is to measure loads on the
The first step is to combine a hydrodynamic model of the waves with a dynamic model for the mechanical and hydraulic PTO system to achieve an understanding of the principles behind optimising energy
Optimization of power production and reliability of the Wave Star prototype in Hanstholm. The funding is given as a temporary additional per production hour, and is activated by attainment of
The project will test the abilities of the wave wing as an energy absorber. The test will be performed in the wave tank at AAU following preparation of measuring setup, component list and plan for