It is possible to reduce the Cost of Energy from Wave Energy Converters by utilizing Digital Hydraulic Power Take Off. The project aims at solving the main technical hindrance for enabling wave energy
The purpose is to secure a strong Danish representation in the international committee working with standardization through IEC TC-114. The project secures, that Denmark will be able to influence and
The project is part of the development of a tradition of cooperation for further development of wave energy, here, through the implementation of an exemplary development process. The project contains
The objective of the project is to develop a gyro electric converter unit for wave energy, and to test experimentally a 5 kW unit under realistic conditions.
The objective of this proof of concept project is to investigate the WaveSpring technology and how it can benefit wave energy converters (WECs). It is expected that the results from the project will
The objectives of the project are to design, test and develop cost efficient mooring solutions for large floating wave energy converters (WECs) and to build national competences in design and
The purpose is to build a 500 kW wave energy demonstrator for the North Sea, as a first very important step towards commercialisation of wave energy. The EUDP funds mainly cover the very extensive
The project is based on a previously tested 1:40 model of a new type of wave energy converter, which has so far shown good properties. The objective of the project is to measure loads on the
The first step is to combine a hydrodynamic model of the waves with a dynamic model for the mechanical and hydraulic PTO system to achieve an understanding of the principles behind optimising energy
Optimization of power production and reliability of the Wave Star prototype in Hanstholm. The funding is given as a temporary additional per production hour, and is activated by attainment of
The project will test the abilities of the wave wing as an energy absorber. The test will be performed in the wave tank at AAU following preparation of measuring setup, component list and plan for