The Danish wave power industry has in connection with this application created a partnership that aims to initiate, strengthen and develop cooperation, and develop a comprehensive joint strategy for
The next step in the development of the Wave Dragon technology is the deployment of a full-scale device in open sea. The development of a 1.5 MW Wave Dragon demonstrator will be based on experiences
Establishment of a data base of O&M data for Wave Dragon established in Nissum Bredning. Large uncertainty exists about fatigue impact on single components used in a wave device caused by repeated
Waveenergyfyn v/ Henning Pilgaard
ForskEL
2010
2011
Use the link Edit/view Data Sheet to edit project description
DEXA1:5 is a development project which aims to use an innovative, simple and flexible technology to validate wave energy as a cost-effective, competitive source of electrical power. Activities defined
The objective of the project is to make a 24 m long 1:10 scale version of a Leancon wave power machine that uses airflows created by a wave moving up and down a tube. The project is based on a
The project aims at optimising Wave Star wave machine production from irregular waves through sophisticated control of the back pressure in the hydraulic system in each floater. The system is being
The project gathers international research communities to develop design tools and a common design basis for wave power facilities to make them more competitive. The aim is to develop a wave-to-wire
Grid connection and electricity production optimisation from a 500 kW Wave Star wave power unit located at Horns Rev. The project is closely linked to project 10239. If the project achieves the