The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
DanWEC Fonden
Green Labs DK
2013
2013
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently
FLOAT2 continues the development of the promising results obtained in FLOAT (2011-1-10649) where significant cost reduction for the WaveStar converter was achieved by substituting the building
The objective of the project is to make a 24 m long 1:10 scale version of a Leancon wave power machine that uses airflows created by a wave moving up and down a tube. The project is based on a
The project aims at optimising Wave Star wave machine production from irregular waves through sophisticated control of the back pressure in the hydraulic system in each floater. The system is being
The project gathers international research communities to develop design tools and a common design basis for wave power facilities to make them more competitive. The aim is to develop a wave-to-wire
Grid connection and electricity production optimisation from a 500 kW Wave Star wave power unit located at Horns Rev. The project is closely linked to project 10239. If the project achieves the