The long-term goals of OES Task 10 are:
1. To assess the accuracy and establish confidence in the use of numerical WEC models
2. To determine a range of validity of existing computational modelling
The long-term goals of OES are:
1. To assess and establish confidence in the use of Wave Energy Converters
2. To engage and integrate Danish industry in international initiatives
3. To identify
The objective of the project is to make a 24 m long 1:10 scale version of a Leancon wave power machine that uses airflows created by a wave moving up and down a tube. The project is based on a
The project aims at optimising Wave Star wave machine production from irregular waves through sophisticated control of the back pressure in the hydraulic system in each floater. The system is being
The project gathers international research communities to develop design tools and a common design basis for wave power facilities to make them more competitive. The aim is to develop a wave-to-wire
Grid connection and electricity production optimisation from a 500 kW Wave Star wave power unit located at Horns Rev. The project is closely linked to project 10239. If the project achieves the